Sunny Hill Festival — Temporary power for Kosovo’s largest festival

Projects05

Sunny Hill Festival

Temporary power for Kosovo’s largest festival

Client
Sunny Hill Festival
Location
Prishtina

01Scope of work

Temporary distribution for stages, lighting and public areas.

  • Main temporary distribution and field panels
  • Supply for stages, sound and stage lighting
  • Lighting for public areas and evacuation routes
  • Power for food stalls, bars and services
  • Technical crew on standby throughout the festival

02 / Challenge

A festival at this scale is built from nothing in a matter of days and has to run without a single interruption in front of tens of thousands of visitors. Every stage, every stall and every evacuation route needs safe supply on ground that was never designed for it.

03 / Solution

We planned distribution zone by zone, with separate panels for stages, public areas and services, so a fault in one zone could never take down another. Cables were routed and protected for crowd and vehicle traffic, and every circuit was tested before the gates opened.

04 / Result

Stages, lighting and services ran without interruption for the entire festival, with our crew on site from rigging to the final teardown.

05Gallery

Next project

Liga Steel

Industrial installation for a metal manufacturer

View project

Start a project

Planning something similar?

Tell us about your site and timeline. We’ll come back with an approach and a quote.