Skip to content
Sinsay Kosovo — Electrical fit-out for a Sinsay store

Projects08

Sinsay Kosovo

Electrical fit-out for a Sinsay store

Client
Sinsay Kosovo
Location
Kosovo

01Scope of work

Main distribution, lighting, power and data for the full store.

  • Store main panel and distribution
  • Retail lighting to brand standards
  • Power for tills, displays and back-of-house
  • Data cabling for point-of-sale
  • Emergency lighting and exit signage

02 / Challenge

International retail chains come with strict technical standards and an opening date that does not move. The installation has to match the brand manual and finish within a short fit-out window.

03 / Solution

We planned the works from the brand’s drawings and coordinated with the other trades on site, finishing lighting and display power in time for the shopfitters.

04 / Result

The store was handed over tested and ready to open, in line with the brand’s technical standards.

05Gallery

Next project

Automatic car wash

Electrical installation for an automatic car wash

View project

Start a project

Planning something similar?

Tell us about your site and timeline. We’ll come back with an approach and a quote.