02 / Challenge
Chargers add significant load to connections that were rarely designed for them. Without a proper assessment, the result is tripped breakers or unnecessary upgrade costs.

01Scope of work
Supply, installation and commissioning of chargers for businesses and car parks.
02 / Challenge
Chargers add significant load to connections that were rarely designed for them. Without a proper assessment, the result is tripped breakers or unnecessary upgrade costs.
03 / Solution
We start by measuring the existing load, then size supply and protection for the number of chargers — with headroom for future expansion.
04 / Result
Stations that run safely from day one and can be expanded without rebuilding.